At both cable ends, its recommended to leave a few meters of cable for reserve. Cable preparation and pulling procedure best practices for. Inspect all scaffolding components defects or damage such as cracks, excessive rust, metal fatigue, unauthorized repairs, bent tubing. Low voltage cable continuity, insulation resistances and phasing form. Retrieve the adc cable from inside the mirror cell and feed it down through the stack and out of the southeast side with the cable run. Guidance notes on job safety analysis for the marine and offshore. Cable pulling cable laying cable rollers cable socks. Rope is a very critical link in the cable pulling system. A steel cable or synthetic rope, called a pulling line, is strung from the puller through each stringing block between the puller and bullwheel tensioner. For telecommunications cables we recommend conductor pulling with a cable pulling head. Method statement for installation of cable tray or trunking.
A common task on site is the installation of electrical cables in cable tray. The rope, on the other hand, requires a perfect eye knot. When pulling pushing the fish tape and wire into a panel board or through conduit with existing conductors it is strongly recommended that the panel board or conductors be deenergized using. Avoid letting the cable stop part way through the pull. The fastening of the pulling rope to the cable must be undertaken with care to avoid losing the cable on the way. Job safety analysis14 for cable laying and pulling scribd. The third stage consists of pulling the pipeline back into the enlarged hole. If possible, utilize twoway communication at both ends of the run, particularly on long runs. This job hazard analysis encompasses a wide range of work activities common to most all fbp locations across the ports site. Cables on faceup horizontally fixed tray must be secured by use of the tie wraps where not in. All cable shall be securely fixed to the tray, work and the complete installation must be carried out in a neat and workmanlike manner without crossovers.
Pulling cable adalah salah satu kegiatan dalam suatu proyek yang bertujuan untuk mengeluarkan dan menarik kabel dari drum cable. Job safety analysis templates 4 free forms for word and pdf. Overhead conductor installation guide general cable. Jha on cable laying and termination safety for all. Jsabuilder sample library 4 short electric arc welding 2 of 4.
A pulling grip may be field installed provided panduit best practices documents are followed. Coil up, secure andor run cable up and over doors to get off of the floor and out of the way. Sp0405r01 field test lv underground cable installations jsa. Maintenance technician painting job hazard assessment 1 job hazard hazard control trip or fall hazards walkingworking surfaces training for working around uneven, wet and slippery surfaces includes warning to others of slippery surfaces. The second stage involves enlarging this pilot hole to a diameter suitable for installation of the pipeline. The end of the pulling line is then attached to the conductor end after it has been threaded through the. Pull grip ical suppor tructions for i ultifiber tight ctorized. Electrical pulling job safety analysis jsa form form mobile. Job safety analysis14 for cable laying and pulling. Job safety analysis jsa library environment, health and. Jsa cable pulling and laying works autosaved free download as word doc.
Jsabuilder sample library 4 short joboperation title. Potential hazards and controls are all linked to the job steps. Submit pulling calculations and plan for each mediumvoltage cable. Jsas are used to describe how to perform a task stepbystep, any hazards associated with a task, and controls to mitigate these hazards. Gently pull and wiggle stuck items to evaluate if they might need to be taken out a different way. At the 30metre point a steel wire rope may be used to complete the pull provided that at least 2 metres of nonconductive rope is used between the cable pulling. To minimize a tripping hazard, keep adc cable out of the working path as much as possible. Cable termination a cut from knife while peeling the cable. While incidents related to pulling cable are rare, there are hazards associated with the activity that. Safe work method statement pulling of cables through conduits. Job safety analysis14 for cable laying and pulling free download as word doc. Block ssheave sswivels 51 5 b l o c k s s h e a v e s s w i v l s complete contractor and industrial supplier sling and rigging specialist since 1930 visit us online at. Full body harness double leg or 2 lanyards rope grab cable grab retractable lifeline anchorage straps rope descenders boatswains chair ladder safety climb yes no yes no base mounted hoist craneboom truck gin pole suspended basket aerial lift device yes no yes no yes no 1 bvbbvbbxhbbx23x bg.
This document supports the power system safety rules and its requirements assembled under high voltage transmission cables category 7. Jseasy builds your sitespecific job safety analysis jsa for electrical work by adding templates of the steps you are going to take, in the order in which you are going to take them. Dalam melakukan pulling cable, diperlukan persiapan dan prosedur yang benar agar tidak terjadi hal yang tidak diinginkan seperti kerusakan kabel dan kecelakaan kerja. The cable tray shall be installed with a 40mm minimum space between the structure and the tray. The sample safe work method statement for the pulling of electrical cables is an extract. Fsutil151 page 1 job safety analysis safety information for the university of california, berkeley facilities services installation, alteration, maintenance, or repair of highlow voltage breakers notify personnel using the circuits to be interrupted in order to avoid potential injuries or interruption of research projects. Jhas are to be prepared by the supervisor or group manager in charge of the work, with work group member participation. Options to use cable pulling machines in equipment room. Electrical employees run or pull wire throughout a worksite. Excessive lifting, twisting, pushing, pulling, reaching, or bending exposure inhaling, swallowing, or absorbing to harmful levels of gases, vapors, aerosols, liquids, fumes, or. Always cut first meters of cable as this part can be damaged by pulling of the cable, bending, water. Jsa cable pulling and laying works autosaved personal. Sep 01, 2016 pulling cable adalah salah satu kegiatan dalam suatu proyek yang bertujuan untuk mengeluarkan dan menarik kabel dari drum cable.
Address 501 westwood plaza, 4th floor box 951605 mail code. Signal persons shall be provided during cable laying pulling and shall be equipped with red and green signal flags. Method statement risk assessment scottish government. A guideline for laying of cables and installation of sleeves. Job safety analysis jsa is a risk assessment technique used to eliminate or reduce the. Cable jack shall be repaired if welded joints are already deteriorated. Guidance notes on job safety analysis for the marine and. Large and awkward cable tray or ladder rack to be handledcarried by two. Job safety analysis14 for cable laying and pulling pdf. Accelerate slowly and smoothly to a constant pulling speed. Print the safe work method statement, swms or jsa sign off sheet and approval form including change management approval in a pdf format or hardcopy via the print option. The pulling eye may be factory installed by the cable manufacturer.
The combination of the rope eye knot and proper cable grip device, along with an approved and rated shackle, make for a typical ideal condition. Exa cable specific load rating of installation o fety glasses tal injury is s chemicals an fiber are very f the eye easi ing proce on multifi best t. Risk assessment cable pulling laying, glanding and termination. Job hazard analysis jha 4m cass cage electronics and cable installation page 1 of 7 jha preparation instructions. Pulling of electrical cable safe work method statementjob safety analysis. Safe work practices on high voltage cables revision no. This involves pulling at one end of the run and feeding at the other. A jsa template or a job safety analysis template, a device for studying perceptions that are beneficial and safe in a workplace, can assist in ensuring that. Steps 11 12 x na x steps 11 12 have been removed to keep this sample to. Apply pulling lubricant compound liberally during the installation. The safest way to conduct electrical work is to shut off electric power and work on deenergized equipment. Back care chapter in ihsas construction health and safety manual m029. The electrical pulling job safety analysis jsa form mobile app provides consistent documentation for your business.
Is a rig based tool for measuring the effectiveness of the jsa process so continuous improvement can be achieved. Alternatively, you can customize the following chemicalspecific sops to match your. Hazard analysis overhead work construction solutions. Anytime an overhead lift is made, workers must perform a jsa. Pulling of electrical cable safe work method statementjob safety analysis cable installation to pvc conduit a pvc electrical conduit is a piping system used for the protection and routing of electrical cables to given articles or items of electrical equipment. To assess the exposure to overhead work, it is necessary to observe a worker pulling wire through conduits on construction sites. Cut or puncture to skin by cables springs sharps from pulling material.
Other installations, such as buried and aerial, have different installation parameters. Back strain, cuts, high pulling tension recoil, carrying wire on shoulders, provide nolube lowfriction wire. Job safety analysis jsa is a risk assessment technique used to eliminate or reduce the occurrence of undesirable incidents during work tasks. Job safety analysis jsa templates ehs standard operating. Electrical pulling job safety analysis jsa form form. Jsas can be used to educate employees on safe practices prior to utilizing equipment. Cardiff road, barry, south glamorgan, cf63 2yl client. Job safety analysis jsa library job safety analysis is a safety tool which can be used by uncchapel hill supervisors and employees to increase the knowledge of hazards in the workplace at their specific work unit that poses a risk of causing injuries and accidents. Coordinate and communicate when pulling wear gloves keep hands back from conduit entrance.
Power cable installation guide cables installed into conduits or trays have installation parameters such as maximum pulling tensions, sidewall pressure, clearance, and jamming, which must be considered. Muscle back injury if material cables, springs, etc. Ask for help when lifting heavy items more than 50 lbs. At csuci our intent and standard practice will be to avoid energized electrical work. Excessive lifting, twisting, pushing, pulling, reaching, or bending exposure inhaling, swallowing, or absorbing to harmful levels of gases, vapors, aerosols, liquids, fumes, or dust exposure to excessive light welding falling pulling at one end of the run and feeding at the other. Anybody can find occupations and duties, especially individuals utilizing labor thats manual or taking up mechanicalrelated gear, which requires a method based off of stages that. This path is usually under the floor or in the ceiling. Submit finished cable tests manufacturers certified test reports showing compliance with icea s68516, part 3, and ul 1072 for physical requirements of the armor and all aeic final tests, including xy plots of corona discharge for the actual cable furnished. Review the jsa based on the score card requirements and assign a score. This can be accomplished with the use of mechanical aids such as pulleys, snatch blocks and tuggers. This pdf is stored securely in the gocanvas cloud and is easily shared. Fsutil151 page 1 job safety analysis safety information for the university of california, berkeley facilities services installation, alteration, maintenance, or repair of highlow voltage breakers. Wire is pulled through chases, conduit, or knockouts to get from the electrical supply to the final destination. Fb, sb, th examine adc cables for rust, abnormal wear, or structural damage to ensure a proper fit in the equipment.